Details
·135 words
Table of Contents
The Pea Hut - This article is part of a series.
Part 11: This Article
Schedule of materials with full costing.
Summary #
The final construction cost was around AUD$35,000. The main reason for overshooting the original budget was that I had no idea electrical work was so extraordinarily expensive. I paid over $7000 just for labour / wiring, not including actual electrical devices.
This figure does not include:
- about $3500 for furnishings (mostly sofa and blinds)
- about $1000 for tools
- arguably, over $2000 in mistakes (surveyor and development application).
The costs can be broadly broken down into these categories:
Note that windows are, and should be, a major expense, given how critical they are to thermal integrity.
Itemised #
Here is a list of almost everything I bought for the construction. (There might be a few minor things I missed). Each has a link to the supplier as well.
The Pea Hut - This article is part of a series.
Part 11: This Article