Schedule of materials with costing.
Summary #
The final construction cost was around AUD$12,500. This figure does not include the spare materials or tools I already had.
The costs can be broadly broken down into these categories:
Elapsed time was about 10 months, but I was working on it maybe half of that time.
Itemised #
Here is a list of almost everything I bought for the construction. Each has a link to the supplier as well.